Comparison
of tracking and quantification.
REPORTING FOR ZINC AT PROTEC
FINISHING
|
||||
|
QUANTITY
(Tonnes) |
PERCENTAGE
CHANGE |
||
|
2013 |
2014 |
CHANGE |
|
ENTERS
FACILITY - USE |
100
- 1000 |
100
- 1000 |
1
- 10 |
DECREASE
OF 4% |
CREATION |
0 |
0 |
0 |
n/a |
CONTAINED
IN PRODUCT |
100
- 1000 |
100
- 1000 |
1
- 10 |
DECREASE
OF 5% |
Comparison of tracking and
quantification.
REPORTING FOR HYDROCHLORIC ACID AT
PROTEC FINISHING
|
||||
|
QUANTITY
(Tonnes) |
PERCENTAGE
CHANGE |
||
|
2013 |
2014 |
CHANGE |
|
ENTERS
FACILITY - USE |
100
- 1000 |
100
- 1000 |
10
- 100 |
DECREASE
OF 6% |
CREATION |
0 |
0 |
0 |
n/a |
CONTAINED
IN PRODUCT |
0 |
0 |
0 |
n/a |
Table 8. Description and Timetable for Implementation of Steps for Equipment or process modification
Option.
|
||
Step
|
Description
|
Estimated
timelines
|
1
|
Determination
of amount of additional time required to achieve a 25% reduction in drag out
on the Lake line and Enterprise line
|
Mar 31, 2013
|
|
It was determined that an additional two minutes of
drain time would be required to reduce the drag out by 25%
|
Completed April 26, 2013.
|
2
|
Evaluation on
the effect of production of using the increased dwell times on the Lake line
and Enterprise line
|
June 30, 2013
|
|
It was determined that increasing the drain time by
an additional two minutes would have a significant adverse effect on the
productivity of the production line making it economically unfeasible to
implement.
|
Completed May 2, 2013.
|
3
|
Programming
of PLC computers with additional dwell times.
|
Dec 31, 2013
|
|
Option will not be implemented as the effect on
production makes it economically unfeasible to implement.
|
Completed May 2, 2013.
|
Comparison of tracking and quantification.
REPORTING FOR NITRIC ACID AT PROTEC
FINISHING
|
||||
|
QUANTITY
(Tonnes) |
PERCENTAGE
CHANGE |
||
|
2013 |
2014 |
CHANGE |
|
ENTERS
FACILITY - USE |
10
- 100 |
10
- 100 |
0
- 10 |
INCREASE
OF 1% |
CREATION |
0 |
0 |
0 |
n/a |
CONTAINED
IN PRODUCT |
0 |
0 |
0 |
n/a |